What we do

Everything a lot
needs, start
to finished.

Five pieces of work that keep a commercial lot looking maintained, and keep small damage from turning into an expensive repair.

How a job runs

Four steps

  1. We walk the lot

    Someone comes out and looks at the actual pavement — cracks, failed sections, drainage, how the traffic moves through it. No charge and no obligation. You get a straight read on what needs doing now and what can wait.

  2. You get it in writing

    One written quote covering the work, the schedule and what is included. If a section is beyond coating and has to be cut out, that is named on the quote rather than discovered halfway through.

  3. We build the schedule around you

    Nights, weekends, or the lot taken in sections. You get the date, the hours we are on site, and how much of the lot is out of use at any one time, before anything starts.

  4. Done, cleaned up, striped

    The lot is coated, painted and swept before we leave. Barricades come up when the surface takes traffic, and you get told when the lot is fully back in use.

Not sure what the lot needs?

That is what the free assessment is for.